March starts off with the completion of the front-end sheet metal repairs.
This area required the most time consuming portion of the repairs due to the
many small areas that were rusted badly and required the fabricating of
patches.
 |
 |
|
Front end sheet metal
is completed. Paul, Steve's father, and I clean up seam seal putty
that Ford seemed to have just thrown at the car
rather than applied only were required March 11, 2007 |
Steve prepares the etching
primer in his HVLP spray gun. This primer used on metal as it
chemically etches into the steel providing a seal and base for
primer and finish coat
March 11, 2007 |
 |
 |
|
Steve applies the
initial etching primers to the front end section. This will
serve as a base for regular primer. March 11, 2007 |
The
engine compartment is looking superb with just the initial coat
of primer
March 11, 2007 |
 |

|
|
Here's a wide shot of the
complete repair work now in primer. Work now will be focused on rear
section. March 11 2007 |
The car is now turned
around with the tail-light panel as rear quarters getting attention March 17 2007 |
 |
 |
|
Peter Hammer, the car's 4th owner stopped by the shop
showing us the piston and rod that blew through the original block
in 1979.
Full
story here
March 17 2007
|
Peter also shared with me
a photo of him and the car taken shortly after he purchased it from
David Calma in 1977
photo from
Peter Hammer 1979 |
 |
 |
|
Here's the damage when a
rod blows in an SCJ engine at about 6300 RPM
March 17 2007
|
Tail-light panel has been removed ready for replacement. Here Steve is cutting out the transition panel. March 18 2007 |
 |
 |
|
The drivers
side door post was very rough however the donor car was solid. Here's the transplanted
B post ready for primer. The quarter panel will be replaced so it was never media blasted.
March 18, 2007 |
The new tail-light panel
is now welded in place replacing the badly deteriorated original.
The left and right rear quarter panels have arrived so they will be
next for replacement.
March 29,
2007 |
 |
|
|
The new trunk floor and
transition panel are now in place. There were almost 100 spot
welds that needed to be opened to remove the old floor and then 100
new spot welds to secure the new steel
March 29, 2007 |
|